Our work

Every room and every slab we have photographed.

Bathrooms, hardscape and decks, renovations, concrete and driveways, and exterior cleaning.

EL +4.00

Built to last. Built with pride.

Inside the door · EL +8.00

Inside the door, where most of these photos were taken.

We finished this accessible walk-in shower with a glass door and grab bars.01
01We finished this accessible walk-in shower with a glass door and grab bars.
This is the tan solid-surface shower, looking at the handheld head.02
02This is the tan solid-surface shower, looking at the handheld head.
We finished this small bath with a dark vanity and a hex mosaic backsplash.03
03We finished this small bath with a dark vanity and a hex mosaic backsplash.
We built this glass half-wall shower with black hardware and tile niches.04
04We built this glass half-wall shower with black hardware and tile niches.

Seen one you want in your house? Call or text any time.

Outside the door · EL -7.00

On the grade, while the job is still open.

This bathroom is in the middle of drywall, with the PVC still rough-in.05
05This bathroom is in the middle of drywall, with the PVC still rough-in.
The room is still under construction, with the subfloor open.06
06The room is still under construction, with the subfloor open.
We have the solid-surface corner panel set, still in the wrap.07
07We have the solid-surface corner panel set, still in the wrap.
We framed the new shower stall and left the insulation open.08
08We framed the new shower stall and left the insulation open.

The part you do not see

EL -6.00 / Surface off

This is what a remodel actually looks like in the middle.

Work in progress. This is the middle of a remodel, not the end of one.

Demo day in a bathroom we are gutting: plastic sheeting, a shop vac and the fixtures stripped back01
The same kind of room stripped to primed walls and bare floor with the tools still in it02
Drywall mudded and taped around a new shower opening, subfloor open and the wiring still hanging03
A wall panel set in place with the room still sheeted off04
  • 01Demo day in a bathroom we are gutting: plastic sheeting, a shop vac and the fixtures stripped back
  • 02The same kind of room stripped to primed walls and bare floor with the tools still in it
  • 03Drywall mudded and taped around a new shower opening, subfloor open and the wiring still hanging
  • 04A wall panel set in place with the room still sheeted off

Yours could be the next one on this page.

Every estimate is free.

Call or textFree estimate